Vesgantti Portable Massage Bed Table - 3-Section Aluminium Foldable Beauty Couch for Reiki Therapy Treatment Salon Healing - Metal Headrest Support/with Carry Bag

£79.99
Liquid error (snippets/product-form line 139): Computation results in '-Infinity' (Save£-79.99)
Voucher
An extra £0.00 OFF with code Apply £0.00 voucher
Code:
Discount price: £79.99

Please use the code at checkout.

  • 【PREMIUM COMFORT】: Table features deluxe cushioning, providing the ultimate comfort for your clients. The table top and armrest wings both are composed of a plush, 5cm thick layer of high-density foam, and the face pillow with a removable cover.
  • 【STRONG SUPPORT】: Precision crafted of premium-grade materials, this professional massage table features a aluminium frame and durable steel support cables, designed to accommodate a maximum weight capacity up 250kg. The adjustable headrest features a premium composite support, resistant to bending and warping. The table legs feature secure, non-slip, non-marring feet, which prevent sliding during massage as well as provide floor protection.
  • 【CONVENIENT & PORTABLE】: Lightweight yet sturdy construction in a streamlined fold-and-carry design makes setup and breakdown a breeze. Weighing 15kg, the table’s compact design can even accommodate all accessories to be stored inside the table if desired. It locks securely with two professional chrome clasps, and features double handles for easy travel. Includes a durable nylon carrying case with an adjustable shoulder strap and side pocket to hold oils and supplies.
  • 【OIL & WATER-PROOF】: The entire table cover is made of water, oil and FIRE-resistant PVC leather, a highly durable, soft, and vegan-friendly material that is not only easy to clean, but has no offensive smell like other materials. Perfect as a Salon or Tattoo chair, Physiotherapy Plinth or a Shiatsu, Swedish Massage and Reiki Bed.
  • 【PRODUCT DETAILS】: Table adjustable height: 59cm to 80cm(height from seat to ground) ,Table Dimensions: 185cm Long (without face cradle) × 60cm Wide (without side arm rests). Folded dimensions: 93 x 63cm. Features an adjustable back & headrest on opposite ends of the table. Backrest has 10 adjustable stages.

Ships FREE, arriving in 3-5 business days

1
2

Reliable massage table

The entire table cover is made of water, oil and FIRE-resistant PVC leather, a highly durable, soft, and vegan-friendly material that is not only easy to clean, but has no offensive smell like other materials. Precision crafted of premium-grade materials, this professional massage table features a hardwood frame and durable steel support cables, designed to accommodate a maximum weight capacity up 250kg. The adjustable headrest features a premium composite support, resistant to bending and warping. The table legs feature secure, non-slip, non-marring feet, which prevent sliding during massage as well as provide floor protection.


3

Product details

 

  • Frame: Aluminum
  • Subtype: 3 sections
  • Material: High quality aluminum frame, durable steel support cables, PVC leather, stainless steel hinge
  • Table adjustable height: 62cm to 87cm(height from seat to ground)
  • Table Dimensions: 185cm Long (without face cradle) × 60cm Wide (without side arm rests).
  • Folded dimensions: 93 x 63cm
  • Max Weight Capacity: 551 lbs
  • Color: White

 


4

Professional Design

 

  • Featuring a removable and adjustable face cradle and armrest.
  • Ideal for professional use in professional therapy clinics or massage center.
  • Top grade cost performance make it also ideal for therapy students & home users

 

5

Package include:

 

  • 1 x Massage table
  • 1 x Headrest
  • 2 x Collapsible Armrest
  • 1 x Carrying Case

 

6

Portable Massage table

This table was designed for years of professional use and can be folded and packed quickly and easily into its carrying bag, which can keep the table from dust and be mobile enough. You can store your accessories under the table for convenience and then conveniently tote or store your massage table in the included carry bag.

See why customers love Vesgantti products

Write a review

Write a review

  • {{ item.author }}

    {{ item.time }}

    {{ item.title }}

    {{ item.content | ellipsis }}

    Continue Reading
    {{ item.author }}

    {{ item.time }}

    {{ item.title }}

    {{ item.content }}

    All Reviews

    All Reviews

    {{ item.author }}

    {{ item.time }}

    {{ item.title }}

    {{ item.content }}

    Customer Reviews

    Be the first to write a review
    0%
    (0)
    0%
    (0)
    0%
    (0)
    0%
    (0)
    0%
    (0)