Vesgantti Nova Vita Hybrid Mattress -24cm-Medium Firm

£59.99 £139.99
57%OFF (Save£80.00)
Voucher
An extra £0.00 OFF with code Apply £0.00 voucher
Code:
Discount price: £59.99

Please use the code at checkout.

Vesgantti Mattress 9.4 Inch Pocket Sprung Mattress with Breathable Foam

Vesgantti®Foam and innersprings combine for a firm supportive sleep experience. Wake up minty fresh and well rested.

  • 【Superior Comfort】- The Vesgantti Mattress combines supportive pocket springs and plush memory foam. Each pocket spring works independently to reduce motion transfer, ensuring a restful sleep without disruptions, even if your partner moves.
  • 【Quality Sleep】- With medium firmness, this mattress provides the perfect balance of support and softness. The advanced pocket spring system aligns your body, while high-density memory foam delivers just the right amount of comfort, offering a universally pleasing sleep experience.
  • 【Breathable and Cooling】- Made with premium memory foam and a hybrid spring design, the Vesgantti mattress promotes airflow to keep you cool and dry. Its breathable materials wick away moisture and prevent overheating, creating a comfortable sleep environment.
  • 【Ultra Quiet for Peaceful Sleep】- Equipped with high-quality pocket springs and slow springback foam, the mattress absorbs motion and vibration, reducing disturbances. Enjoy a peaceful night's sleep without waking up from movement or noise, ideal for couples.
  • 【Mattress-in-a-Box】- Delivered vacuum-sealed and rolled for easy transport, the mattress inflates in 10 seconds after unpacking. Please allow up to 72 hours for it to fully expand (once opened, it cannot be rolled back).

Ships FREE, arriving in 3-5 business days

  • 100-night
    risk-free trial

  • Free shipping
    in a box

  • Honest materials
    No Toxic

  • 10-Year
    Limited Warranty

    Best Prices,Best Service,
    Best Mattress

    The Mattresses for your good sleep
    Slumbering comfort.

    5ft king size mattress pocket sprung mattresses memory foam mattress vesgantti king mattress
    BT2 A+2new
    BT2 Height & Size

    See why customers love Vesgantti products

    Write a review

    Write a review

    • {{ item.author }}

      {{ item.time }}

      {{ item.title }}

      {{ item.content | ellipsis }}

      Continue Reading
      {{ item.author }}

      {{ item.time }}

      {{ item.title }}

      {{ item.content }}

      All Reviews

      All Reviews

      {{ item.author }}

      {{ item.time }}

      {{ item.title }}

      {{ item.content }}

      Customer Reviews

      Based on 23 reviews
      96%
      (22)
      4%
      (1)
      0%
      (0)
      0%
      (0)
      0%
      (0)
      N
      Nimish
      Value for

      Value for money

      J
      Julie
      Perfect Mattress – Just as Described & Super Comfortable!

      I’m very happy with this mattress! The appearance is just as beautiful as the product photos—elegant and high-quality. Most importantly, it sleeps incredibly well! The support is excellent, relieving pressure on my back and shoulders, while still feeling plush enough for total comfort. I’ve been waking up feeling refreshed, thanks to restful, uninterrupted sleep.

      Delivery was smooth, and the mattress arrived in perfect condition. For anyone looking for a supportive yet cozy bed, this one’s a winner! Highly recommend.

      B
      Brenda Ellis

      Very comfortable would recommend this mattress

      J
      Jennifer millard
      Double Vesgantti Mattress

      Really quick delivery. Good value for money. Have purchased 4 mattresses from Vesgantti - very happy and would recommend.

      T
      Tony C
      Comfortable good looking firm mattress

      Love this mattress and I��ve had a fair few over the years. I suffer with a bad back and this is quite firm so ideal for me. The overall touch and feel of this is spot on and you know that it��s a quality product. I hadn��t heard of this brand of mattress before but so glad did find it. I��ve slept well on this and my other half is very happy with it. I had the king size variant and the sizing of it and look is spot on and well recommended.