Vesgantti Folding Mattress 10/15cm Gel Memory Foam Foldable Mattress Tri-fold for Travel, Camping, Guest Bed, CertiPUR-US Certified, Grey

£104.99 £159.99
34%OFF (Save£55.00)
Voucher
An extra £50.00 OFF with code Apply £50.00 voucher
Code: £50 OFF
Discount price: £54.99

Please use the code at checkout.

【Vesgantti Folding Mattress】- This tri-fold mattress features a space-saving design. It can be easily folded into three sections with extra handle, making it convenient for storage and transportation. Whether you need an extra bed for guests, a comfortable sleeping option for camping, or a mattress for small living space, this mattress is the perfect solution. It can be effortlessly stored in a closet or carried in the trunk of your car, providing you with flexibility and convenience 

【Premium Comfort and Support】- Crafted with high-quality materials, this folding mattress offers exceptional comfort and support. The dual-layer construction includes a 3cm soft and cool memory foam layer that conforms to your body, providing a cozy sleeping surface. Beneath that, a 7/12cm supportive core helps to evenly distribute your body weight, relieving pressure points and ensuring a restful sleep 

【Soft and Comfortable】- The unique texture of the fabric offers exceptional comfort. It is supple enough to conform to the body's contours, providing a cozy and supportive surface. The bottom fabric of the mattress features an anti-slip design. This effectively prevents the mattress from shifting or sliding during use, providing a stable and secure sleeping surface. The fabric of this folding mattress is free from harmful chemicals, making it gentle on the skin 

【Easy to Clean and Maintain】- We understand the importance of easy cleaning, especially for a mattress. This tri-fold mattress is designed with a removable and washable cover, allowing you to keep it clean and fresh with minimal effort. Simply unzip the cover and toss it in the washing machine whenever it gets dirty. The mattress itself is also easy to wipe clean, ensuring that it free from stains and odors 

【Versatile Application】- This mattress is not limited to just one use. It is incredibly versatile and can be used in a variety of settings. In addition to being a great guest bed, it can be used as a floor mattress for playrooms or as a temporary bed during home renovations. It's also a popular choice for outdoor activities like camping or picnicking. Its adaptability makes it a valuable addition to any household or travel gear collection

Ships FREE, arriving in 3-5 business days

folding mattress

foldable mattress

tri fold mattress

camping mattress

mattress

single mattress

See why customers love Vesgantti products

Write a review

Write a review

  • {{ item.author }}

    {{ item.time }}

    {{ item.title }}

    {{ item.content | ellipsis }}

    Continue Reading
    {{ item.author }}

    {{ item.time }}

    {{ item.title }}

    {{ item.content }}

    All Reviews

    All Reviews

    {{ item.author }}

    {{ item.time }}

    {{ item.title }}

    {{ item.content }}

    Customer Reviews

    Based on 25 reviews
    60%
    (15)
    20%
    (5)
    8%
    (2)
    0%
    (0)
    12%
    (3)
    H
    HELEN B
    Very comfortable

    Very comfortable

    M
    Mark Reeves
    Incorrect mattress sent

    Incorrect mattress sent,

    I ordered a 15cm mattress but received a 10cm.

    After contacting them I was told “ We currently do not have a collection service. Considering the inconvenience of the return. Is a 20 GBP refund will be okay for you to keep it?”

    As the error was theirs, I declined the offer and suggested that I would consider a £30 refund to keep the mattress.

    It is just under 2 weeks and I have not received a response yet. I will be waiting until Friday, If there is still no response I will be asking full refund, as they have sent an incorrect item.

    Initial response from them was good but is now very poor

    W
    William Boyd
    Very happy with my new

    Very happy with my new matterss

    C
    ComfyCamper
    I wouldn't have bought this in person in a shop

    I wouldn't have bought this in person in a shop. Even if the measurements were in the product info, it was fat too large when I actually saw it. I bought this for camping and would definitely say it's not suitable for that purpose. There are some handles but no storage bag and the mattress unfolds when carried. The covering material is stretchy, sticky, uncomfortable, and poor quality. I contacted them for info on return and refund. After about 19 emails I finally got an almost full refund. I paid £89 and they refunded me £79, which was the price of a small single with storage bag from the same brand, ordered from Amazon this time. I had already placed this order before my refund was agreed, because so much time was wasted in this process. Lesson learned: order from Amazon.

    k
    k bennion
    Good Value

    Great value and comfy