Vesgantti Linen Bed Frame with Adjustable Headboard & Solid Wooden Slats, Easy Assembly, No Box Spring Needed, Under Bed Storage

£139.99 £209.99
33%OFF (Save£70.00)
Voucher
An extra £50.00 OFF with code Apply £50.00 voucher
Code: £50 OFF
Discount price: £89.99

Please use the code at checkout.

【Stylish and Comfortable】- The headboard is upgraded to an adjustable style for 20-30cm mattress, choose the mattress height that suits you. Mainstream tufted button style is versatile and stylish, perfect with a variety of decorating styles, premium buttons can enhance the furniture grade. The bed frame headboard is made of high quality breathable linen-look fabric and built-in high density memory foam, you will feel very soft and comfortable when you lean on the headboard to read

【Rock-solid Bed Frame】- The bed frame with upholstered headboard is equipped with 12 solid wood slats and 4 steel supports, which reinforce the bed frame and provide robust support, reduce environmental pollution and extend the life of the bed frame. The maximum load-bearing capacity can be up to 360kg, so there is no need to worry about it’s firmness

【Ultra-Large Storage】- With 20 cm of height space under the bed frame, put whatever you want under it. Convenient for out-of-season clothing, shoes, luggage and other daily necessities, the sweeper robot passes through it easily to keep your bedroom clean and tidy, this is the most favourite style for the families with limited space. And the families with pets don’t have to worry about their pets getting stuck

【Noiseless & Non-Slip Design】- The firm wood slats are equipped with Velcro and EVA mute strips, avoiding friction between the solid wood slats and the metal frame and sliding of the mattress, which prevents friction and effectively eliminates noise. Furthermore, the thickened metal bed feet can protect the floor from scratches, prevent sliding and reduce noise, giving you a quiet and comfortable resting environment

【Easy Assembly】- The confusing parts of the bed frame assembly are numbered accordingly, and the instructions are simple and easy to understand. Moreover, the process of installation is shown on the product page. Please do not worry, it can be easily installed in just 30 minutes with two-person cooperation. If you have any assembly or other problems, please feel free to let us know

Ships FREE, arriving in 3-5 business days

1

See why customers love Vesgantti products

Write a review

Write a review

  • {{ item.author }}

    {{ item.time }}

    {{ item.title }}

    {{ item.content | ellipsis }}

    Continue Reading
    {{ item.author }}

    {{ item.time }}

    {{ item.title }}

    {{ item.content }}

    All Reviews

    All Reviews

    {{ item.author }}

    {{ item.time }}

    {{ item.title }}

    {{ item.content }}

    Customer Reviews

    Based on 2 reviews
    100%
    (2)
    0%
    (0)
    0%
    (0)
    0%
    (0)
    0%
    (0)
    A
    Anonymous
    Great

    Great

    A
    Anonymous
    Lovely bed frame

    Lovely bed frame. Easy to put together in your own, excellent quality and price x